Blue Circle Energy Developments
Solar PV and Battery Energy Storage Development.
Blue Circle Energy Developments originates, permits and designs ground-mounted solar and battery storage in Barbados, and arranges its finance and construction: 52 Community Solar Gardens in development, 30 MW AC, each on one to five acres and connecting to the feeder that serves its community.
Community Solar Gardens
52 sites, not one large plant.
A Community Solar Garden is a ground-mounted solar array with battery storage on one to five acres of leased or owned land, connected to the grid feeder that serves the surrounding community. Each is sized between 500 kW and 1 MW AC. The majority are laid out for dual use, with generation above and grazing or fodder beneath, worked by a partner farmer from the area. Each solar garden is structured for local participation and ownership and designed to help fund school STEM programming in the community once it is operating.
Distributed by design
The 11 kV feeders of the distribution network set the limit on how much generation each community can take. Small sites with storage put generation and grid support where that limit binds, feeder by feeder. Projects of this size pass planning and connection review without the natural or community impacts of a large plant, and they connect at distribution voltage. The portfolio is permitted, connected and built one site at a time, and each site serves the community that hosts it.
Site selection
150 sites across Barbados were reviewed on four tests: agricultural value, natural heritage value, capacity on the feeder, and ground conditions. They were distilled to the 52 under development: those with the clearest prospects of planning permission, interconnection, economic and community return.
Scale
52 projects, 30 MW AC. Gardens are 500 kW to 1 MW AC on one to five acres, connected at 11 kV.
Storage
Every site has room for batteries. Two kinds are in development: batteries beside the arrays, sized to relieve the feeder's thermal limit and to provide voltage and frequency support, and larger stand-alone battery projects. Each site can also carry power plant controllers and remote, automated dispatch to facilitate utility operator control.
Land
Land is leased or owned. Site rights are agreed with each landowner before any application is made. Landowners are often partners in the project and can receive royalties on the system's generation. The majority of arrays are mounted high enough to keep the ground beneath them in agricultural use, such that a farmer from the area can work and receive agricultural value from each site.
Garden to school
Each Garden is to support the schools in its community.
Blue Circle Energy intends each of its Community Solar Gardens in Barbados, once it is operating, to give the schools in its community an investment interest in the Garden: a share of its income for 20 years, to fund renewable energy and sustainability teaching, equipment and materials. Each school is also to have a display in its hall showing what its Garden produces.
Blue Circle Energy and Sol Ecolution agreed in their July 2022 memorandum of understanding to grant local educational institutions an investment interest in the Community Solar Gardens, to give participating schools a 20-year cash flow for sustainability and renewable energy programming for their students.

A Community Solar Garden
An investment interest: a share of its income, for 20 years
The schools in its community
Portfolio
Projects in development across Barbados.
The projects are at every stage from site rights to licence. 13 projects, 14.5 MW DC, hold every permit and licence required to build. They are ready to construct, awaiting feeder thermal-loading and grid-wide system-loading mitigation by the utility. The map shows where the projects sit, by parish.
- 52Community Solar Gardens in development
- 30 MW ACPortfolio capacity · 60 MW DC
- 13Ready to construct · 14.5 MW DC
Projects by parish
Projects per parish
- 0
- 1–2
- 3–5
- 6–9
- 10 or more
| Parish | Projects | |
|---|---|---|
| St. Lucy | 16 | |
| St. Philip | 9 | |
| St. James | 8 | |
| Christ Church | 5 | |
| St. John | 5 | |
| St. Andrew | 3 | |
| St. Peter | 2 | |
| St. Thomas | 2 | |
| St. George | 1 | |
| St. Michael | 1 | |
| St. Joseph | 0 | |
| Total | 52 |
Process
How a project moves.
Every project passes through the same six stages. Blue Circle Energy Developments funds development from the company's own balance sheet and carries each project to construction-ready: site rights, permits and licences, a buildable design, and construction funding and long-term ownership arranged. Ownership then passes to the long-term owner, which operates the project once built.
Originate
Identify the site; prepare the preliminary system and financial design; negotiate and sign the site access rights agreement with the landowner and, where the land has agricultural or grazing capability, agree its dual use.
Secures: Site rights
Permit
Planning permission; the utility's connection impact assessment; the electrical design review; the renewable energy generation licence; the power purchase agreement.
Secures: The licence to build and to sell
Design
Detailed system and storage design for the site and its point of connection.
Secures: A buildable design
Finance
Construction funding and long-term ownership arranged with the project's long-term owner: for the majority of the portfolio, Sol Ecolution.
Secures: Funded construction
Construct
A Barbadian design-and-construction partner engaged; installation, commissioning and grid interconnection.
Secures: Energisation
Transfer
Ownership of the project passes to its long-term owner; the asset management platform established; the owner operates it for an operating term of 20 years or more.
Secures: Commercial operation
Development risk carried by Blue Circle Energy Developments, to construction-ready
Finance and transfer
For the majority of the portfolio, Sol Ecolution is to be the long-term owner. Under a memorandum of understanding between the two companies (announced July 2022), Blue Circle Energy Developments develops those Gardens through the pre-construction phase; Sol Ecolution then funds their construction and operates them for 20 years. The two companies are exploring investment in the Gardens by local pension funds, credit unions and cooperatives, and have agreed to grant local educational institutions an investment interest. The rest of the portfolio is financed and transferred through the same stages.
People
The team.
Cameron Steinman, P.Eng.
President
Electrical engineer, a professional engineer for 25 years; leads Blue Circle Energy's technical and strategy work. Founder and President of Endura Energy, an engineering, procurement and construction contractor and solar developer, sold to UGE International.
Andrew Lord
Vice President, Regulatory and Legal
Leads regulatory and legal work: permits, licences, interconnection and power purchase agreements. Formerly a partner at DLA Piper in Toronto, practising in renewable energy; took part in drafting Barbados's standard interconnection and power purchase agreements.
Khalid Grant, P.Eng.
Country Manager
Mechanical engineer, based in Barbados; has designed and project-managed more than 200 distributed solar PV projects and takes them through permits, licences and interconnection. Formerly at Panasonic Eco Solutions Canada; a former President of the Barbados Renewable Energy Association.
Alison Goudy, CFA
Director, Finance and Operations
Leads financial analysis and the investment case for solar and storage projects. Formerly Vice President of Finance and Development at Endura Energy, and a Vice President at Brookfield Financial for nine years.